One of them was the discovery that the dishwasher was leaking. It has been repaired.
Curved wall now repaired.
And new floor installed.
All the way into the kitchen.
This bathroom had no ceiling light -- only the light above the sink. While the ceiling was down the contractor installed a light over the tub -- nice.
Same ceiling -- all done.
Living room floor is ready (once it has been swept) for tile and carpet
Garden room has all the wall board up and has been painted -- green, of course. (no picture of the fresh paint)
I've never had a vinyl floor that I liked. They always have a pattern and indentations in them that collect dirt and difficult and sometimes impossible to thoroughly clean.
So, this time I selected a commercial floor for the laundry room. All one flat piece -- no bumps to try to keep clean.
Ray's library has gone through a transformation. The ceiling has a minor redesign and new lights.